The Minster Green works around Croydon Minster are complete. The old subway is filled in and new lighting now shows off the Grade I listed church at night.
The Minster Green project around Croydon Minster is finished. The old subway under Roman Way has been filled in, and new lighting now picks out the church after dark.
Executive Mayor Jason Perry announced the completion in his weekly message on Friday 20 November. The lighting was switched on after Evensong last Sunday, 15 November, he said.
Overview
- What is done: the subway is filled in, and the space in front of the Minster has new paving, planting and seating.
- The wall: a new wall built from 16,000 individually hand-knapped flints, with a Minster Green sign.
- The lighting: new architectural lighting on the Minster, switched on on Sunday 15 November.
- Who paid: the council’s Growth Zone, which reinvests business rates in local infrastructure.
What has changed
The mayor’s message lists what the work has delivered:
- the old subway filled in, opening up the area
- better access to the Minster from the town centre
- new paving, planting and seating
- a wall of 16,000 hand-knapped flints and a Minster Green sign
- architectural lighting on the church itself
“The Minster has been at the heart of Croydon for centuries,” Mr Perry said.
Later than planned
When the council set out the designs in November 2025, it said building would start in early 2026. It expected the work to be finished “by next summer”, meaning summer 2026. It has been completed in November instead.
The 2025 plans also included a sculpture, trees framing views of the Minster and wildflower planting. This week’s message does not mention a sculpture.
The council said one aim was to tackle antisocial behaviour, by removing the hotspots around the subway. It worked with the Minster, residents and community groups on the design, through focus groups, exhibitions and heritage walks.
Why the Minster matters
Croydon Minster is one of the borough’s few Grade I listed buildings. The council’s 2025 announcement says the site has been a place of worship since the 9th century. The new green sits between the church and Roman Way, in the Old Town, west of the Whitgift Centre.
The project is paid for through the Growth Zone, which lets the council keep and reinvest business rates. Growth Zone schemes are delivered by the council with the Greater London Authority and Transport for London.
What it means for you
You no longer need the subway to reach the Minster from the town centre. The council said the scheme would give better access to the pedestrian crossing on Roman Way. The new lighting means the church is now lit up after dark.
Have a photo of the new Minster Green or the lighting? We would like to use one with this story. Send it to hello@croydontoday.co.uk with your name for the credit.
Have your say